Footings · Stem Walls · Slabs · ADUs
Footings, stem walls and slabs formed, reinforced and poured to your engineer’s plans. A foundation contractor in Seattle that handles drainage and inspections so framing starts on time.
New homes, additions, garages and backyard ADUs. Everything from the base under the footing to the drains around the wall.
Continuous and pad footings set on undisturbed soil or engineered fill, at the depth and width your plans require.
Formed concrete walls with rebar, anchor bolts and hold-downs placed exactly where the structural plans call for them.
Garage, shop and basement slabs over a compacted base, with vapor barrier and reinforcement as specified.
Compact foundations for backyard cottages and attached ADUs, often as a mono pour with footing and walls placed at once. Tight lots usually need truck and pump access planned ahead.
Perimeter footing drains and drain rock so groundwater moves away from the foundation. Damp-proofing is added only when the plans or site conditions call for it.
Excavation, compacted base and gravel done by the same crew, so the ground is right before the concrete truck arrives.
In Seattle, the foundation is inspected before any concrete goes in. These are the points on SDCI’s residential foundation checklist, and we get them right the first time.
Footings must bear on undisturbed soil or engineered fill, with loose soil, mud and water cleaned out of the bottom.
Steel size and spacing must match the plans, with at least 3 inches of concrete cover where it’s cast against earth.
Sized, spaced and placed per the structural plans, which matters a lot in an earthquake region like Puget Sound.
The top of the foundation wall has to sit at least 6 inches above finished grade, keeping the framing away from ground moisture.
Footings must be level, or stepped where the ground slopes more than 1 foot in 10 feet, which is common on Seattle lots.
Some projects need special inspection for soil bearing, pin piles or high-strength concrete. We coordinate with the inspector your engineer specifies.
From layout to backfill, in four steps.
We review the structural plans, set out building lines and check elevations before any forms go up.
Forms set, rebar tied, anchor bolts and hold-downs placed exactly where the engineer put them.
City inspection first, then concrete placed, consolidated and finished.
Forms stripped, footing drains installed (plus damp-proofing where required), then backfilled and compacted for the framers.
Wet winters, clay soils and the chance of an earthquake are all part of building here. A foundation that’s off by an inch, sits on soft fill or traps water around the crawl space causes problems for the life of the house.
Because our crew also does the excavation and utility connections, the hole, the base, the drains and the concrete are one job, on one schedule, with nobody waiting on another trade.
Common questions from homeowners and builders before the pour.
The approved plans set the depth, based on the building code, the soil and your engineer’s design. Footings must sit on undisturbed soil or engineered fill and never on frozen ground. We build exactly to the plan.
For a typical house or ADU, forming, inspection and pouring take a couple of weeks, depending on size, weather and inspection scheduling. The concrete then needs time to cure before heavy loads go on it.
Yes. In Seattle, footings and foundation walls are inspected before the pour. The inspector checks bearing soil, rebar, concrete cover, anchor bolts and hold-downs against the approved plans.
A monolithic (mono) pour means the footing and the walls are poured in one go instead of in two separate stages. It saves time on smaller foundations like ADUs and garages, and leaves no cold joint between footing and wall. Whether it fits your project depends on the plans and the site.
Light rain is usually manageable with planning: water pumped out of the footings and fresh concrete protected. Heavy rain, standing water or freezing temperatures mean we reschedule rather than risk the pour.
Yes. Backyard cottages and attached ADUs are a big part of residential building in Seattle, and they often sit on tight lots where access for trucks and pumps has to be planned ahead. Many of them are a good fit for a mono pour.
Most new foundations are built from plans that are part of your building permit, often designed by a structural engineer. We build to those plans and check with your engineer if questions come up on site.
Footing drains, yes: perimeter drains with drain rock, connected to an approved discharge point, keep water away from the foundation. Damp-proofing is usually not needed, and we add it only when the plans or site conditions require it. Drains are planned together with the rest of the site’s storm drainage.
Send us your plans and timeline. We’ll review the foundation design, walk the site and give you a clear quote.