Pre-Demolition Setup and Site Management in Seattle

Most demolition delays start weeks before the machine shows up. Our pre-demolition services in Seattle keep the surveys, utility disconnects and site prep on track so demo day happens on schedule.

Rosestone crew setting up a job site next to a house before demolition in Seattle

What Our Pre-Demolition Services Cover

Every house is different, but the checklist before a teardown in Seattle looks about the same. Here’s what we take off your plate.

Permit Coordination

We line up the demolition permit with the rest of your project paperwork, so the teardown isn’t waiting on a form nobody filed.

Asbestos Survey & Notice

An AHERA-certified inspector has to survey the building, and a notice goes to Puget Sound Clean Air Agency before demo. We schedule both at the very start.

Utility Disconnects

Power, gas, water, phone and cable are each shut off by their own provider. If a builder runs the project, we coordinate with them on anything not yet ordered. Homeowners have to place these requests themselves, so we walk you through who to call and when.

Side Sewer Capping

Seattle requires a side sewer permit before the old line is capped. Our utility crew caps it and gets it inspected well ahead of demo day.

Fencing & Site Security

Construction fencing, gates and signage go up first. They keep the public out and protect the neighbors’ side of the property line from day one.

Erosion Control & Trees

Silt fence, inlet protection and tree protection fencing go in before any soil is disturbed. In a wet Seattle winter, that’s what keeps mud off the street.

What Has to Happen Before Demo Day

These steps follow a set order, and some come with waiting periods. Skip one and the schedule moves. Details come from Puget Sound Clean Air Agency and SDCI.

AHERA Asbestos Survey

Required for any structure with more than 120 sq ft of roof area, which includes houses and most garages. Results go to everyone who may disturb the material.

10-Day PSCAA Notice

The notification is filed even when no asbestos is found, and demolition can’t start until 10 days after filing. We file it as early as possible.

Abatement Before Demo

Any asbestos the survey finds has to be removed by a certified abatement contractor first. We schedule them so they don’t overlap with our crew.

Lead Paint in Older Homes

Homes built before 1978 may have lead-based paint. Anyone disturbing it has to be EPA-certified and follow lead-safe work practices.

Utility Termination

Each provider terminates its own service on its own timeline, and the request usually has to come from the property owner. We make sure it goes in early, not the week before demo.

Waste Diversion Report

Seattle requires a waste diversion report for demolition over 750 sq ft. We plan how materials will be sorted so the report is easy to complete.

Rodent Baiting

Rat bait stations go in about two weeks before demolition and come out no later than two days before work starts. The builder usually handles this, but with notice we can set it up and manage it for you if it’s agreed on in your estimate.

How Pre-Demo Prep Works

Four steps from the first site walk to a lot that’s ready for the machine.

01

Site Walk & Scope

We note utilities, trees, access and neighbors, and list everything the city and agencies will ask for.

02

Paperwork & Schedule

Surveys, notices and permit pieces filed in the right order, with dates you can plan around.

03

Disconnects & Capping

Utility disconnects confirmed, side sewer capped and inspected, hazardous materials cleared.

04

Ready for Demo

Fencing, erosion control and tree protection in place. The lot is ready for demolition.

One Crew From Prep to Teardown

Pre-demo work is mostly coordination: agencies, utilities, abatement contractors and inspectors, each on its own timeline. When one company owns that list, nothing falls between the cracks.

Because we also handle the demolition, excavation and utility work that come after, the prep is planned around what actually happens next on your site.

Excavator bucket staged on a Seattle residential site during pre-demolition prep

Pre-Demolition FAQ

The questions homeowners and builders ask us most before a teardown.

Yes. Puget Sound Clean Air Agency requires an AHERA-certified inspector to survey any structure with more than 120 sq ft of roof area before demolition, and that includes houses and garages. A notification also has to be filed, even if the survey finds nothing.

The agency requires a 10-day wait after the notification is filed. If asbestos is found, a certified abatement contractor has to remove it first. That’s why we start the paperwork on day one.

Each provider shuts off its own service: Seattle City Light for power, Puget Sound Energy for gas, Seattle Public Utilities for water, plus phone, cable and internet companies. The request usually has to come from the property owner. If you’re working with a builder, we coordinate with them on anything that hasn’t been ordered yet. If you’re a homeowner, we’ll tell you exactly who to call and when, so nothing is still live on demo day.

An open side sewer lets debris and stormwater into the city system. Seattle requires a side sewer permit before capping, and the cap gets inspected. We do this as part of our utility connection work.

It may have lead-based paint. Contractors who disturb it must be EPA-certified and follow lead-safe practices. We flag it during the site walk so it’s planned for, not discovered mid-job.

Rat bait stations need to be in place about two weeks before demolition and removed no later than two days before work starts, so rodents don’t scatter into neighboring properties. The builder usually arranges this. If you give us notice and it’s included in your estimate, we can set up and manage the baiting for you.

Yes. We can handle the prep alone and hand over a site that’s ready. Most clients have us do prep and demolition together, since it keeps everything on one schedule.

Plan for at least a couple of weeks. The 10-day asbestos waiting period alone sets the minimum, and utility shutoffs or abatement can add time. You’ll get a realistic timeline after the site walk.

Planning a Teardown? Start With the Prep.

Send us the address and your target demo date. We’ll tell you what needs to happen first and how long it will realistically take.