Home  /  Services  /  Demolition

Houses · Garages · Outbuildings · Concrete

Residential and Commercial Demolition in Seattle

From a single garage to a full teardown, we take structures down safely, sort the debris and leave a clean lot. A demolition contractor in Seattle that’s also your excavation crew.

Aerial view of a house demolition in progress by a Seattle demolition contractor

What Our Seattle Demolition Crew Takes Down

Whole houses, garages, outbuildings and old concrete. If a structure is in the way of your next project, we take it out completely.

Full House Demolition

Complete teardowns for rebuilds, ADUs and lot redevelopment, including the foundation when the plan calls for it.

Garages, Sheds & Outbuildings

Detached garages, carports, sheds and old outbuildings removed, often in a single day once utilities and paperwork are cleared.

Tight Lots & Property Lines

Structures built right up to the property line come down without touching the neighbor’s side. In rare cases we remove only part of a building and frame in reinforcement for what stays.

Concrete & Foundation Removal

Old slabs, driveways, patios, retaining walls and footings broken out and hauled, with the rebar separated for recycling.

Debris Sorting & Recycling

Metal, concrete, clean wood and mixed waste separated on site. It keeps disposal costs down and makes Seattle’s waste diversion report simple.

Lot Clearing & Rough Grade

Once the structure is gone we pull stumps and leftover debris, rough-grade the lot and leave it ready for excavation.

Demolition Done by the Book

Seattle has more rules around demolition than most people expect. These are the ones that shape the schedule. See SDCI’s demolition permit page for the city’s full requirements.

Demolition Permit

Buildings in Seattle need an SDCI demolition permit. We make sure it’s in hand, along with every pre-demo requirement, before equipment rolls in.

Asbestos Clearance

A survey and a Puget Sound Clean Air Agency notice are required for structures over 120 sq ft of roof area, followed by a 10-day wait.

Utilities Off & Capped

Every utility has to be terminated and the side sewer capped under permit before the building comes down.

811 Before Digging

Breaking out footings means digging, and Washington law requires a locate request at least two business days ahead.

Dust, Noise & Neighbors

We keep dust down with water, work within permitted hours and keep the street and sidewalk clear of debris.

Waste Diversion Report

For demolition over 750 sq ft, Seattle requires a waste diversion report after final inspection. Sorting on site makes it easy to document.

How a Demolition Job Goes

From the first visit to a clean lot, in four steps.

01

Site Visit & Quote

We look at the structure, access, neighbors and what stays, then send a written quote with haul-off spelled out.

02

Pre-Demo Checklist

Permit, asbestos clearance, utility disconnects and rodent baiting (when agreed in the estimate) handled through our pre-demolition services.

03

Controlled Demolition

The structure comes down in a planned order, away from neighbors and power lines, with dust kept under control.

04

Haul-Off & Clean Lot

Debris sorted and hauled, the lot rough-graded and the street swept before we leave.

Why Seattle Builders Hire Us for Demo

Demolition looks simple from the street. The hard part is everything around it: a neighbor’s fence two feet away, a power line over the driveway, a basement full of things nobody mentioned.

We size the machine to the lot and protect what stays. And since we also do excavation and foundations, the lot we leave behind is ready for the next step, not just empty.

Excavator tearing down a house during residential demolition in Seattle

Demolition FAQ

Straight answers to the questions we hear before almost every demo job.

It depends on the size and construction of the house, access for equipment, whether the foundation and driveway come out, and whether asbestos abatement is needed. We give a written quote after seeing the site, with haul-off and disposal spelled out so there are no surprises at the end.

For a typical single-family home, the teardown and hauling usually take a few days. The prep before it (asbestos survey, the 10-day notice, utility disconnects) often takes longer than the demolition itself.

It depends on the structure. Seattle’s asbestos rules apply to anything with more than 120 sq ft of roof area, which covers most garages. We confirm exactly what applies to your structure during the site visit.

If you want them gone, yes. Footings, slabs, driveways and retaining walls can all be broken out and hauled, and we separate the concrete and rebar for recycling.

We sort it on site: metal, concrete, clean wood and mixed waste go to different places. Recycling what we can keeps disposal costs down and helps with Seattle’s waste diversion report.

Rarely. Almost all of our work is full demolition of a structure. Partial removal happens when a property line forces it, for example taking down half of a shed, and then we frame in reinforcement for the part that stays. Interior gut-outs for remodels aren’t something we typically take on.

No. We walk the site with you before we start and again when we finish. During the work we keep you posted on progress.

Ready to Clear the Lot?

Send us the address, a few photos and what’s coming down. We’ll come out and give you a straight quote.